Positive train control (PTC) is the practice of monitoring and, when necessary, remotely controlling trains. Per federal mandate, PTC networks must be in place and operational for all railroads operating in the US by 2015. Of course, positive train control means maintaining a large network, with many elements distributed in wayside enclosures near the tracks.